
Ark Energy, a subsidiary of Korea Zinc Co, a zinc smelter, confirmed that the BESS would use lithium-iron phosphate (LFP) technology and be eight hours in duration.
On the solar aspect of the project, either crystalline silicon or thin-film technology would be used, mounted on an east-west tracking system. It will consist of up to 730,000 bifacial solar modules.